Weber Point Yacht Club
Work Weekend Sign-Up
May 3-4, 2025
Repair Isinglass panels __________________________
Disassemble/haul out old BBQ grills __________________________
Wash all windows __________________________
Clean window blinds _ Rhonda Wetzel __________
Repair/paint exterior window/door trim __________________________
__________________________
__________________________
__________________________
Cut/clear backyard overgrowth __________________________
Inspect/repair loose dock planks and rub-rails __________________________
Repair/replace faulty Twist-Lok receptacles __________________________
Pull and inspect/clean water pump and
pick-up screen __________________________
Service/clean and start small engines:
pressure washer, wood chipper, lawn mower __________________________
Service/clean and start (gas) fire pump,
Energize (electric) fire pump __________________________
Check/repair all lighting (exterior, interior) __________________________
Work Weekend Sign-Up (cont.)
Inspect/secure any loose exterior sheet metal _________________________
Steam clean/shampoo blue cloth chairs in the galley _________________________
Wipe down galley cabinets, wash all dishes,
glassware, bowls, flatware, kitchen utensils, pots,
pans, etc. _________________________
Clean pantry and wash all articles in the pantry _________________________
Clean west side galley screen door _________________________
Clean galley air conditioning vent _________________________
Purge book inventory __Carolyn Jamison_________
Clean both bathrooms and showers _________________________
Tighten lug bolts for toilet in small bathroom _________________________
Hang mirror on the back of the door in the
large bathroom _________________________
Clean/wash white plastic chairs in boat house _________________________
Clean white lounge chairs _________________________
Clean flourescent light covers (4) in boat house,
inside and out _________________________
Sort club decorations, toss unwanted items _________________________
Install metal seam strips to galley floor _________________________
Install new linoleum under galley sink _________________________